Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 17 results ...

Arditi, D and Balci, G (2009) Managerial Competencies of Female and Male Construction Managers. Journal of Construction Engineering and Management, 135(11), 1275–8.

Cable, J K, Jaselskis, E J, Walters, R C, Li, L and Bauer, C R (2009) Stringless Portland Cement Concrete Paving. Journal of Construction Engineering and Management, 135(11), 1253–60.

Caerteling, J S, Halman, J I M, Song, M and Dorée, A G (2009) Impact of Government and Corporate Strategy on the Performance of Technology Projects in Road Construction. Journal of Construction Engineering and Management, 135(11), 1211–21.

Chan, A P C, Chan, D W M and Yeung, J F Y (2009) Overview of the Application of “Fuzzy Techniques” in Construction Management Research. Journal of Construction Engineering and Management, 135(11), 1241–52.

Chan, A P C, Lam, P T I, Chan, D W M, Cheung, E and Ke, Y (2009) Drivers for Adopting Public Private Partnerships—Empirical Comparison between China and Hong Kong Special Administrative Region. Journal of Construction Engineering and Management, 135(11), 1115–24.

Chen, C and Orr, R J (2009) Chinese Contractors in Africa: Home Government Support, Coordination Mechanisms, and Market Entry Strategies. Journal of Construction Engineering and Management, 135(11), 1201–10.

Chen, H L (2009) Model for Predicting Financial Performance of Development and Construction Corporations. Journal of Construction Engineering and Management, 135(11), 1190–200.

El-Rayes, K and Jun, D H (2009) Optimizing Resource Leveling in Construction Projects. Journal of Construction Engineering and Management, 135(11), 1172–80.

Goh, Y M and Chua, D K H (2009) Case-Based Reasoning for Construction Hazard Identification: Case Representation and Retrieval. Journal of Construction Engineering and Management, 135(11), 1181–9.

Gransberg, D D and Riemer, C (2009) Impact of Inaccurate Engineer’s Estimated Quantities on Unit Price Contracts. Journal of Construction Engineering and Management, 135(11), 1138–45.

Lee, H, Seo, J, Park, M, Ryu, H and Kwon, S (2009) Transaction-Cost-Based Selection of Appropriate General Contractor-Subcontractor Relationship Type. Journal of Construction Engineering and Management, 135(11), 1232–40.

Park, M, Ji, S, Lee, H and Kim, W (2009) Strategies for Design-Build in Korea Using System Dynamics Modeling. Journal of Construction Engineering and Management, 135(11), 1125–37.

Park, S H (2009) Whole Life Performance Assessment: Critical Success Factors. Journal of Construction Engineering and Management, 135(11), 1146–61.

Park, T, Kim, M K, Kim, C and Kim, H (2009) Interactive 3D CAD for Effective Derrick Crane Operation in a Cable-Stayed Bridge Construction. Journal of Construction Engineering and Management, 135(11), 1261–70.

  • Type: Journal Article
  • Keywords: Bridge construction; Cable-stayed; Bridges; Computer aided drafting; Construction equipment; Cranes;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000101
  • Abstract:
    The high expectation of esthetic and functional quality in modern civil infrastructure has resulted in the increased demand for long span bridges. In advanced or developing countries, long span bridges such as cable-stayed and suspension bridges are considered even as landmarks that symbolize the prosperity or culture of the region. These long span bridges require higher level of design and construction technologies than other types of bridges. In particular, the construction of cable-stayed bridges involves precise and sophisticated operation of construction equipment such as derrick cranes. However, it is not easy to plan the operations of a derrick crane before the actual construction process takes place. Unexpected spatial constraints in the construction site may hinder the smooth operation of a derrick crane, which leads to lower than expected productivity and safety. This study applies interactive three-dimensional (3D) computer aided design (CAD) to the derrick crane operation for the purpose of identifying potential problems. Construction managers can have the two way process with the 3D CAD system to interactively test their construction plans and scenarios. The case study shows that the interactive 3D CAD system significantly improves the constructability of the cable-stayed bridge construction.

San Cristóbal, J R (2009) Time, Cost, and Quality in a Road Building Project. Journal of Construction Engineering and Management, 135(11), 1271–4.

Wethyavivorn, P, Charoenngam, C and Teerajetgul, W (2009) Strategic Assets Driving Organizational Capabilities of Thai Construction Firms. Journal of Construction Engineering and Management, 135(11), 1222–31.

Zahraie, B and Tavakolan, M (2009) Stochastic Time-Cost-Resource Utilization Optimization Using Nondominated Sorting Genetic Algorithm and Discrete Fuzzy Sets. Journal of Construction Engineering and Management, 135(11), 1162–71.